How to Get a CDSCO Manufacturing License for Medical Devices
Want to make medical devices in India? Then you’ll need a CDSCO manufacturing license before a single unit goes on sale. The rules come from the Medical Devices Rules, 2017 (MDR 2017), and they cover everything from how your device is classified to how your factory keeps its records.
It looks like a lot at first. It’s manageable once you take it in order.
Start with the risk class
Everything else depends on this. MDR 2017 puts devices into four classes: A (low risk), B (low-moderate), C (moderate-high) and D (high). A simple reusable instrument sits in A, while a heart valve sits in D.
Your class decides which authority reviews your file and which form you fill in. Class A and B applications go to the State Licensing Authority. Class C and D go to the Central Licensing Authority. Guess wrong and you’ll lose weeks.
Pick the right form
- Class A or B: Form MD-3 for a manufacturing license, or MD-4 if you’re applying for a loan license. You’ll receive MD-5 or MD-6.
- Class C or D: Form MD-7 (manufacturing) or MD-8 (loan). Approval comes as MD-9 or MD-10.
Pull your documents together
This is where most applicants slow down. For a CDSCO manufacturing license, expect to prepare:
- a Plant Master File and a Device Master File
- your quality management system documents
- site details and a floor layout
- equipment and testing information
- proof that the device meets the Essential Principles of Safety and Performance
- test and validation reports
Keep the files tidy and consistent with each other. Reviewers notice when one document says one thing and another says something different.
Apply online and prepare for inspection
Applications for a CDSCO manufacturing license are filed through the government’s online portal. The authority reviews your papers and may send inspectors to your site, depending on the device class. So what you’ve written has to match what’s on the factory floor, because they will check.
Maintain Regulatory Compliance
Getting the license is only the start. You still have to run your quality system properly, keep manufacturing records up to date, handle complaints, and carry out post-market surveillance. Slip on these and your CDSCO manufacturing license can come under question later.
